The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and inādepth technical skills to participate as a member of a project team in a mentored role.
SAP C_TS422_1909 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
NEW QUESTION 50
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?
- A. The cross-plant status
- B. The most restrictive status
- C. The plant-specific status
- D. The least restrictive status
Answer: B
NEW QUESTION 51
What are properties of MRP Live?
There are 2 correct answers to this question.
Response:
- A. The code is written in SQL Script
- B. Data is read sequentially from the database tables
- C. It uses the same BAdis as classic MRP
- D. It is executed on the database server
Answer: A,D
NEW QUESTION 52
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- B. MRP creates capacity requirements only if the work center has sufficient capacity.
- C. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- D. MRP creates capacity requirements without checking the capacity of a work center.
Answer: D
NEW QUESTION 53
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To determine the work in progress along the production line
- B. To stage different components for a production line simultaneously
- C. To reduce the total production lead time for along production line
- D. To provide timely updates of inventory management for the staged components
Answer: A,D
NEW QUESTION 54
Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question.
Response:
- A. Elimination of output condition tables
- B. Elimination of customer master tables
- C. Elimination of document index tables
- D. Elimination of status tables
- E. Elimination of LIS tables for rebates
Answer: B,C,D
NEW QUESTION 55
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Functional Location BOM
- B. Class BOM
- C. Sales Order BOM
- D. Work Center BOM
Answer: A,C
NEW QUESTION 56
What are prerequisites for using batch derivation?
There are 2 correct answers to this question.
Response:
- A. Batch where-used list
- B. Batch determination selection conditions
- C. Process instructions
- D. Receiver-sender relationships
Answer: A,D
NEW QUESTION 57
What is the purpose of collective orders?
- A. To post production costs on a cost collector instead of the production order
- B. To post any component withdrawals single back flush with order confirmation
- C. To combine order management of co-products and by-products with the main product
- D. To manage production orders for an entire finished product on multiple levels
Answer: D
NEW QUESTION 58
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.
- A. Lot size
- B. Maximum stock level
- C. Purchase orders
- D. Safety stock
Answer: A,D
NEW QUESTION 59
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
- A. It is converted into a production order.
- B. It is converted into a schedule line.
- C. It is converted into a planned order.
- D. It is converted into a reservation.
Answer: D
NEW QUESTION 60
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. What determines whether the storage location can be derived from the production version?
- A. MRP Profile
- B. MRP Group
- C. Plant Data
- D. MRP Controller
Answer: B
NEW QUESTION 61
Which of the following is a valid sequence of the main activities in product on order processing?
- A. Creation, scheduling, release, variance calculation, confirmation
- B. Creation, release, scheduling, material withdrawal, confirmation
- C. Creation, staging, release, material withdrawal, confirmation
- D. Creation, scheduling, release, material withdrawal, confirmation
Answer: D
NEW QUESTION 62
What is SAP's strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
Please choose the correct answer.
Response:
- A. PP Standard Sales and Operations Planning
- B. Flexible Planning
- C. Integrated Business Planning
- D. APO Demand Planning
Answer: C
NEW QUESTION 63
What are some uses for the low-level code assigned to each material? Note: There are 2 correct answers to this question.
- A. It is used by engineering to identify sub items in an engineering bill of material(BOM).
- B. It is used by product costing to determine how costs are rolled up.
- C. It is used by ATP to determine the priority of alternative components.
- D. It is used in MRP to determine the sequence in which materials are planned.
Answer: B,D
NEW QUESTION 64
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.
- A. Past quotation quantities
- B. Market intelligence
- C. One-off events
- D. Past sales order quantities
- E. Past procurement quantities
Answer: B,C,D
NEW QUESTION 65
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?
- A. Use a resource group.
- B. Use a heuristic.
- C. Use a propagation range.
- D. Use a planning group.
Answer: B
NEW QUESTION 66
Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer.
Response:
- A. Warehouse order
- B. Warehouse task
- C. Outbound delivery request
- D. Outbound delivery order
Answer: C
NEW QUESTION 67
During production order creation, several valid production versions are found. How does the system choose the product conversion?
- A. Alphanumeric or quota arrangement
- B. Planned order or material number
- C. Lot size or material cost
- D. Validity period or sales order
Answer: A
NEW QUESTION 68
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- B. The lot size range must be within the lot-size range of the assigned routing.
- C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- D. The assigned routing must NOT have alternative sequences.
- E. The assigned routing must be a rate routing.
Answer: A,B,C
NEW QUESTION 69
In which data object is the production line (Repetitive manufacturing relevant work center) maintained?
Please choose the correct answer.
Response:
- A. Production version
- B. Bill of material
- C. Repetitive manufacturing profile
- D. Cost collector
Answer: A
NEW QUESTION 70
How can you enhance the system statuses of a production order scenario with user statuses?
Please choose the correct answer.
Response:
- A. By enhancing the system status customizing table with user statuses
- B. By activating the user statuses in status and action management
- C. By creating a user profile and assigning it to the production scheduling profile
- D. By defining a status profile and assigning it to the order type
Answer: A